Skip to content
For investors, contractors and designers

Bill of quantities and cost estimate

From your drawings or model we measure quantities item by item and price them by trade. Every quantity traces back to the drawing it was measured from.

Send an enquiry
Exploded building model with slabs, walls and columns colour-coded for quantity take-off

What you get

Item-by-item quantities

Earthworks, concrete, masonry, insulation and finishes, with unit and quantity for every item.

Cost estimate

Unit rates and totals by trade. You can replace the rates with your own or with contractor bids.

From what you have

DWG, DXF or PDF drawings, or an IFC/Revit model. From a model, quantities are read directly.

Traceable quantities

Each item names the drawing and dimension it came from, so a designer or contractor can check it.

How it works

  1. 1

    Send the drawings

    Plans, sections, elevations and a description, or a model.

  2. 2

    Quote

    We check that the drawings are complete and send a price and timeline.

  3. 3

    Take-off

    Quantities item by item, then the estimate by trade.

  4. 4

    Delivery

    Bill of quantities and estimate in Excel and PDF.

Pricing

Indicative prices

Bill of quantities and cost estimategross floor area of the building
from €0.80 / m²
Minimum per project
€250

Prices exclude VAT; VAT is added at the rate of the delivery country (21% in Montenegro). Your quote states the exact amount and timeline.

Request a quote

Frequently asked questions

Isn't the bill of quantities part of the main design?

It is. When it goes into the main design in Montenegro, it is signed by the licensed designer of that project; we prepare the take-off. The service is also for investors who want an independent estimate and contractors who need quantities for a bid.

Which formats do you accept?

DWG, DXF, PDF, IFC and Revit (RVT). Scanned drawings without dimensions are not enough.

How is it priced?

By gross floor area, from €0.80/m² with a minimum of €250 per project, excluding VAT. Infrastructure and complex building services are quoted per project.

How long does it take?

It depends on the size of the building and how complete the drawings are. Your quote states the timeline.

Let's Talk About Your Project

Tell us what you need — we will find the right solution for you.

✓ Reply within 1 business day✓ Free scoping call✓ openBIM / IFC✓ Invoicing from Montenegro